GNR Building update-April 2020
LEP has officially taken over this site from 16 Mar. 2020 and done some initial preparation work before Lockdown. The construction has now resumed from 28 Apr. 2020 following the move to Alert level 3.
LEP has officially taken over this site from 16 Mar. 2020 and done some initial preparation work before Lockdown. The construction has now resumed from 28 Apr. 2020 following the move to Alert level 3.